Grassrooters' factual flyer on the racetrack

THE OPPONENTS OF RMP WANT YOU TO KNOW:
The attitude of Riverside Motorsports Park and Merced County government toward your environment, health and public safety is: Gentlemen, start your engines, put your pedal to the metal and pass every law and regulation protecting public health and safety on the right as fast as you can.

RMP Chief John Condren claims he’s got your elected officials in his pocket.

Although it’s too early to start planning a ground-breaking party, we can report that RMP has won the support of 4 of the 5 members of the Merced County Board of Supervisors … and we may succeed in securing the unanimous support of the Board once the EIR is released. In addition, RMP has secured the approval and support of State Senator Jeff Denham, US Congressman Dennis Cardoza, 5 Chambers of Commerce within Merced County, the City Councils of Atwater and Merced, and RMP has the support of the California Builders Industry Association. Added to this list are over 1,500 local Merced County citizens who have signed to be on our project update mailing/e-mail list.

--Riverside Motorsports Park, 1 January 2005 “To all our valued investors and supporters, Happy New Year!”

A quorum of supervisors should be disqualified from voting on this project at all, when a developer is bragging that loudly about how he owns them. To begin with, Jerry O’Banion and Kathleen Crookham. O’Banion is widely known as having steered the project from the west side to its present location. Crookham gave a promotional talk on the RMP project before the Clipper Club at Central Presbyterian Church. Their involvement with the project ought to disqualify them from voting on it.

In a January 1, 2005 letter to RMP investors, Condren claimed:
· The traffic plan for the project was complete; NOT TRUE
· Zoning restrictions pertaining to noise impacts have been amended such that unlimited Motorsports activities
may occur without additional restrictions; NOT TRUE
· The RMP Master plan is approved; NOT TRUE
· RMP event schedule will include all the largest names in motorsports. NOT TRUE

Two years later, there is no traffic plan; the EIR simply states that the noise level from auto racing is a “significant, unavoidable impact” to be overridden by a vote of the supervisors; the RMP master plan is only a draft that will be rewritten after – not before – the supervisors approve the project; while RMP tells its investors it will draw all the big names in auto racing (and hundreds of thousands of spectators), it tells the locals the eight tracks in the project will be almost exclusively for local car clubs, drawing only a few thousand spectators.

The Big Consultants Shuffle. The County recommended a firm it has done a great deal of work with, including the lion’s share of planning for UC Merced. It couldn’t come up with a traffic plan, so RMP replaced them with another firm willing to say there is a traffic plan when there isn’t one.

RMP wrote its investors two years ago the traffic studies are all done by Jan. 2005. At the Nov. 15 public hearing on the project, county Public Works informed the public there was no traffic plan. The RMP traffic consultant agreed: there is no traffic plan beyond waiting to see what roads spectators choose.

On Nov. 28, for the first time, county Public Works informed the people of Delhi, that Shanks Road, El Capitan and Palm were going to be a major thoroughfare for race traffic until two weeks ago, that some county roads would need to be widened, which might call for eminent domain if residents and RMP cannot agree on prices.

Who are RMP’s investors? These people are presumably underwriting a project that will significantly worsen our already severe air pollution, fill our country roads with frequent, periodic traffic jams, and fill our ears with the din of racecar engines. The Merced public has a right to view a full financial disclosure statement on who these people are who are investing in the destruction of our environment – before the supervisors we elected vote to approve this project. The public needs to ask how much RMP investor money will end up in campaign coffers of officials we elect.

Indemnification. The County and RMP have an agreement:

Indemnification and Hold Harmless
Approval of this Project is for the benefit of Applicant. The submittal of applications by Applicant for this Project was a voluntary act on the part of the Applicant not required by the County. Therefore, as a condition of approval of this Project, the Applicant agrees to defend, indemnify and hold harmless the County of Merced and its agents, officers, employees, advisory agencies, appeal board or legislative body of Merced County (collectively, “County”) from any and all claims, actions and proceedings against the County to attack, set aside, void, or annul an approval by the County concerning the Project occurring as a result of the action or inaction of the County, and for any and all costs, attorneys fees, and damages arising
therefrom (collectively, “Claim”).”

– INDEMNITY AND HOLD HARMLESS AGREEMENT BETWEEN COUNTY OF MERCED AND RIVERSIDE MOTORSPORTS PARK, LLC, Sept. 12, 2006.

This agreement allows the County to approve this project without taking any responsibility for these new, impacts to our environment added on top of UC Merced and its induced housing boom – air, traffic and noise – because they aren’t liable for legal costs.
However, the County has not yet signed the agreement. nor did they include it in the conditions in the staff report on the project.

Water. A year ago, Board Chairman Mike Nelson misspoke, saying Atwater would supply RMP with potable water. Winton doesn’t have enough water. Water Castle is supplying off-base residents is contaminated. So, where’s the drinking water?

Overweening control of Planning Director.

Modifications to the Development Plan and Administrative Permit may be approved administratively by the Planning Director if determined consistent with the intent of the Master Plan, the RMP EIR, and the procedures and finds defined in Section 18.50.02(D) of the Merced County Zoning Code.

-- P. 7-1, RMP Draft Master Plan

This means that planning director, in concert with RMP, can change the plans for the project any way they want to, unless the public challenges it. In other words, the planning director works from RMP, not for you.

Conflict of interest. The Merced County Board of Supervisors is the land-use authority for all unincorporated land in the county. But, it is also the land-use authority for the former Castle Air Force Base. The RMP project, which adjoins Castle, cannot be approved until the board overrides the noise-zone for the Castle airport established by the airport commission. The board plans to do this on Dec. 12. But, these are two separate actions, both with large consequences to the noise level, and the airport override must be analyzed in the RMP environment impact report. The County did not do that. In fact, there is no analysis on the environmental, public health and safety impacts from this decision. The County is in conflict of interest on these two projects.

Contempt for the public. The County did not make the new staff report to the public (including state and federal agencies) available until 4:30 p.m. on Monday, the day before the hearing. Nothing could better express the County’s complete contempt for the public and favoritism for special development interests. It also perfectly expresses the County’s lack of respect for law and elemental fairness. In violation of public access provisions within the California Environmental Quality Act, the public has not been allowed to view the working file of this project without recourse to the state Public Records Act. This is illegal.

The lack of analysis of cumulative economic and environmental impacts from the chaotic growth in Merced requires the public to demand a moratorium on any more projects not already approved by appropriate local, state and federal agencies. RMP is not approved by the appropriate agencies, therefore the board should not approve it before the county general plan has been fully updated in a legally compliant fashion.

The board of supervisors must deny the Riverside Motorsports Park General Plan Amendment No. GPA03-005, Zone Change Application No. ZC03-007, the Board of Supervisors’ override of the Castle Airport Land Use Commission, the Environmental Checklist, the Notice of Application, Draft Master Plan, Draft EIR, Final EIR, Appendices to Vol. 2, Response to Comments, Vol. 1, Staff Report, Findings, Resolutions and Overrides, and Indemnification.

The process that produced these documents was seriously flawed by

· an inadequate project description that can be modified at will by administrative decision without public review;
· serious conflicts of interest involving at least two members of the board voting on the project and the applicant’s claims nearly two years ago that he already had a super-majority of supervisors in his pocket;
· segmenting and peacemealing the entirely different project of the override of the Castle Land Use Commission decision, which requires its own EIR;
· deliberate failure of the County to make essential project documents available to the public in a timely manner;
· failure of the land-use authority to perform its mandatory duty to consult federal resource regulatory agencies on the environmental impacts of the proposed project;
· failure to do any analysis on the economic impacts of the proposed project on the Castle Commercial-Aviation Economic Development area;
· failure of the County to do cumulative economic impact studies on the impacts of this proposed project and other commercial, growth-inducing anchor tenants;
· failure of the County to consider the negative impact on the proposed project of the third failure of the transportation tax measure;

OPEN APPEAL TO MERCED COUNTY BOARD OF SUPERVISORS

Dear Supervisors Pedrozo, Crookham, Nelson, Kelsey and O’Banion: November 27, 2006

Thank you, Supervisor Deidre Kelsey, for scheduling three town-hall meetings this week to address the immediate impacts that the proposed Riverside Motorsports Park will have on your district. We would ask that supervisors Pedrozo, Crookham, Nelson and O’Banion also schedule meetings in their districts and listen to their constituents’ concerns about the RMP project.

Town-hall meetings are not formal hearings and we question how much impact they will have. However, the Board of Supervisors has closed the public hearing. At this stage, town-hall meetings appear to be the best way we have to afford citizens the opportunity to participate in the process.

At the close of the public hearing on RMP, there was still no traffic plan. The traffic study that had been done was based on a flawed, deceptive traffic count in the wrong season for either agricultural harvests or auto racing. This is unacceptable to the public.

The RMP project proposes that District 4’s rural two-lane roads be used as highways for thousands of cars to reach the raceway site. The RMP project will negatively impact the roads, environment and public health and safety of other districts as well. Districts 1, 2, and 3 (Livingston, Atwater & Merced) will be impacted by traffic congestion, slowed response by emergency vehicles, noise, and air quality threats of the project.

All residents will be impacted by road deterioration. Our nationally recognized air pollution could ultimately cause the federal government to stop highway funds until we make greater efforts to clean up our air. We will then be asked to raise our taxes to fix the roads because development does not pay its way.

All Merced County residents will be impacted when the Board of Supervisors lowers the standards of our out-dated General Plan to accommodate the RMP project. The Board should not even consider projects with the massive impacts of RMP before it updates the county General Plan.

We request that the Board of Supervisors do the following:

· hold meetings in all the districts and be accountable to those that elected you to represent our County, not developers’ interests;
· re-open the public hearing on RMP, since about 50 people were not able to testify at the last hearing;
· re-circulate RMP environmental documents to allow the public to review RMP’s and the Planning Department’s responses to public testimony;
· re-circulate RMP environmental documents to allow the public to review the traffic study, which was not finished at the time of the public hearing.
· not decide on RMP or other large development projects before the County has finished updating its General Plan.

Thank you.
Tom Grave
Merced County- Citizens Against the Raceway

WHAT YOU CAN DO:

Write and call your supervisor and tell them to reopen the public hearing and/or deny this project.

Attend Board of Supervisor meetings on Dec. 12 at 5 p.m. and on Dec. 19 at 10 a.m.

Write and call Congressman Cardoza, whose wife is a doctor.

Write and call state Sen. Jeff Denham and Assemblywoman Cathleen Galgiani.

Paid for by Citizens Against RMP